論文名稱
Title
有效減少公共工程爭議之策略研究
Strategy of Effectively Resolving Construction Disputes
系所名稱
Department
畢業學年期
Year, semester
語文別
Language
學位類別
Degree
頁數
Number of pages
82
研究生
Author
指導教授
Advisor
召集委員
Convenor
口試委員
Advisory Committee
口試日期
Date of Exam
2022-05-26
繳交日期
Date of Submission
2022-07-06
關鍵字
Keywords
工程爭議、策略管理、SWOT分析、解決紛爭、仲裁程序
Engineering Disputes, Strategic Management, SWOT Analysis, Dispute Resolution, Arbitration Procedures
統計
Statistics
本論文已被瀏覽 211 次,被下載 0
The thesis/dissertation has been browsed 211 times, has been downloaded 0 times.
中文摘要
營造業近年來因競爭激烈、材料、運費價格升高,以及普遍缺工等問題,嚴重壓縮獲利空間。而公共建設部分,也由於預算刪減,發包價格受到限制,以及機關嚴格的履約管理,導致許多中小型規模之營造業者,因不諳契約或法令規範,與機關發生爭議,完成的工作亦遲遲無法取得報酬,使營造業者於經營困境雪上加霜。因此,營造業者基本的生存要件,不再只是於同業競爭中屹立不搖而已,尚且必須確保如何快速地將爭議解決,以儘快取得報酬,使現金得以週轉不息,營造業者才可能多元運用工程款,而加以持續經營。
既然如何有效率的減少爭議對於營造業取得報酬,以及繼續經營亦已成基本之事,本研究探討營造業經常發生糾紛的原因,就實務上常見的紛爭的類型加以整理,以提出於工程締約前、履約中預防爭議之方法。並以南部中小型承攬業者A公司為例,確立了減少紛爭之目標,先以SWOT分析方法,針對個案A公司之優勢、劣勢、機會和威脅進行剖析,再進一步以A公司實際上發生的兩個案件,具體的去探討個案發生紛爭的原因,透過經營管理學中的「策略管理」,具體提出較適合於A公司這種傳統營造業管理模式之解決之道,藉由加強內部專案管理制度以及外部法律關係之掌握,以達到避免類似爭議再次發生之目標。
另就實務上面對工程爭議時,可以選擇之解決紛爭途徑加以整理歸納,並以A公司實際發生紛爭時,因選擇之紛爭處理途徑不同,如以調解、仲裁或訴訟等方式,其耗費之程序、時間及費用加以比較,分析不同程序導致之不同結果之原因,對於A公司營運上所造成的影響。建議未來承攬人及業主均能合約中直接約定以仲裁程序作為解決營造業糾紛之方式,期能以利紛爭之有效解決,並創造雙贏局念。最後建議A公司應與時俱進行數位化轉型,方能更有效的達成專案管理,達成降低紛爭之目標!
Abstract
The profit margin of the construction industry was severely strained in recent years due to fierce competition, rising material and freight prices, and labor shortage. In the public construction sector, dispute emerges frequently between small and medium-sized construction companies and the government agencies due to budget cuts, restrictions on price, and strict contract performance management. Additionally, their lack of understanding of the contracts or regulations often leads of delay in completion. These issues result in further delayed remuneration/payment to the companies, making the construction industry even more difficult to operate. Therefore, for a company to survive in the current construction industry, it not only need to outperform business rivals, but also be familiar with resolving disputes to obtain remuneration as soon as possible. The study here aims to identify common underlying causes leading to the disputes and to develop effective strategy in preventing disputes prior to and during the execution the contracts. Two specific cases of Company A, a medium-sized contractor in southern Taiwan, was investigated. By conducting a strength, weakness, opportunity, and threat (SWOT) analysis on Company A, specific resolution for each case was proposed, focusing on the applicability in the management of traditional construction industry, such as the case with Company A. Through expertise in strategic management, approaches strengthening the internal project management system as well as aligning external legal affairs with company’s strategy are proposed to avoid the recurrence of similar disputes.
Specifically, the options for resolving disputes regarding construction was analyzed and summarized. The advantages and disadvantages of settling disputes through different procedures, such as mediation, arbitration, or litigation are discussed, addressing issues like the fees, costs, processes, time taken, and the impact on the operation of the business. It is suggested that both the contractor and the owner directly stipulate in the contract that all disputes are to be resolved through arbitration in order to reach a resolution promptly, creating a win-win situation. Additionally, it is suggested that Company A carries out digital transformation in order to execute project management more effectively, preventing disputes.
目次 Table of Contents
目 錄
論文審定書 i
摘 要 ii
Abstract iii
目 錄 v
圖 次 vi
第一章 緒論 1
第一節 研究背景與動機 1
第二節 研究目的 3
第三節 研究步驟與流程 5
第二章 文獻探討 6
第一節 營造業常見工程爭議類型 6
第二節 策略管理與執行 15
第三節 工程專案管理 22
第四節 數位化轉型 34
第五節 工程糾紛常見的處理方式及程序 37
第三章 研究方法及架構 40
第一節 研究方法 40
第二節 研究架構 45
第四章 分析與結果 46
第一節 個案公司分析 46
第二節 實際案例分析 48
第三節 A公司減少紛爭之策略 63
第五章 結論與建議 71
第一節 研究結論 71
第二節 建議 73
參考文獻 75

參考文獻 References
公共工程委員會(2004年),政府採購爭議處理事件案源及問題類型分析。
方至民(2020),策略管理概論(三版),前程。
方至民、曾志宏(2021),管理學理論探索與實務應用(二版),前程。
王伯儉(2008),工程契約法律實務(二版),元照。
王伯儉(2020),專案工程契約管理(二版),五南。
李有容(2021)。履約階段-情事變更。載於陳秋華、王雪娟(主編),100個從開工、完工到保固不可不知的重要事項,元照。
李家慶(2006),工程法律與索賠實務(一版),中華民國仲裁協會。
吳繼熊(2022),營建專案管理實務(初版),詹氏書局。
易力行(2021),工程企業經營管理實務教戰手冊(初版),三民。
黃宗文(2021),公共工程履約管理100問(二版),元照。
蕭偉松(2010),現場情況差異之爭議,載於工程爭議問題與實務(二)(一版),中華民國仲裁協會。
李忠軒(2022),論工廠數位轉型之進退兩難-以S公司為例。
電子全文 Fulltext
本電子全文僅授權使用者為學術研究之目的,進行個人非營利性質之檢索、閱讀、列印。請遵守中華民國著作權法之相關規定,切勿任意重製、散佈、改作、轉貼、播送,以免觸法。
論文使用權限 Thesis access permission:自定論文開放時間 user define
開放時間 Available:
校內 Campus: 已公開 available
校外 Off-campus:開放下載的時間 available 2025-07-06

您的 IP(校外) 位址是 18.224.59.231
現在時間是 2024-05-03
論文校外開放下載的時間是 2025-07-06

Your IP address is 18.224.59.231
The current date is 2024-05-03
This thesis will be available to you on 2025-07-06.

紙本論文 Printed copies
紙本論文的公開資訊在102學年度以後相對較為完整。如果需要查詢101學年度以前的紙本論文公開資訊,請聯繫圖資處紙本論文服務櫃台。如有不便之處敬請見諒。
開放時間 available 已公開 available

QR Code